Freight elevators

Nákladní výtahy

Get a free elevator quote

Pavel Háněl
Director of Modernisation and New Installations

Choosing a freight elevator

The design of the freight elevator depends on the environment and the intensity of traffic
When selecting technologies for freight elevators, we look primarily at the environment and the intensity of the traffic in which the elevator is to operate. It is very important to design the correct dimensioning, the durability of the materials used or the dust-proof design, for example.

Freight elevator technology

We cooperate with proven manufacturers from the Czech Republic and abroad
Freight elevators are often located primarily in manufacturing plants, factories, supermarkets or warehouse buildings and in these operations the nature of the required elevator design must be carefully identified.
That is why we do not focus on only one manufacturer when it comes to supplying freight elevators, but we cooperate with several proven manufacturers from the Czech Republic and abroad. The availability of most spare parts is ensured within 48 hours.
Our staff are trained on all the technologies we install and this knowledge is constantly renewed as part of an effective training programme.
Freight elevator technology

LIFTS CAN BE CUSTOMISED

The design and equipment of the passenger lift can be adapted to your needs and architectural plan.
Take a look at the layout designs and swatches.

The catalogue is in English.

How is the turnkey delivery of a freight elevator

Under standard conditions, the completion time of the entire work "ON KEY" is 3 to 4 months from the signing of the contract.
1
Visit to the customer and measuring of the lift (or taking all the information necessary for the preparation of the initial study and indicative price proposal).
2
Preliminary discussion of the project with state institutions (building authority, sanitation, fire brigade, monuments, etc.).
3
Meeting with the customer to select and determine the design of the elevator from the submitted samples.
4
Preparation of a price offer and commercial and technical documentation including an indicative layout drawing of the elevator. The price offer also includes conditions for subsequent service.
All of the above activities are, as a rule, carried out without obligation and free of charge.
5
Signing the contract for the work
6
Preparation of complete project documentation
7
Negotiating and securing a building permit
8
Commencement of installation including:
  • Elevator shaft construction (if part of the work)
  • Installation or assembly of the lift
  • All construction work
9
Before commissioning:
  • Commissioning of the lift
  • Testing by an authorised person
  • Carrying out noise tests
  • Obtaining the approval decision
10
Handing over the work

Watch the video

What does the implementation of a freight elevator look like
See the construction of a freight elevator step by step. Each similar realization has its own specifics determined by the client's requirements. Here, for example, we installed the door directly on the loading ramp. But that wasn't all. Get to know the installation of the Orona freight elevator with a load capacity of 4,500 kg and discover the interesting details of the whole event.

Want to find out what a new freight elevator costs?